Living Room Renovation
- Want a media wall with a real fire under the TV?
- Old radiators, tired fireplace and a room that never feels warm?
- Prefer one team to plaster, wire, plumb and decorate it, not five?
I'm a Local Gas Engineer, I Build the Living Room Around the Fire and the Heating
Book a Free Design VisitFixed written price, staged payments, no obligation. Or call 07596 848767.
Trusted & Accredited
3 Steps to Your New Living Room
From a free design visit to a finished room, usually in one to two weeks
Recent Living Room Renovations in Walsall
Media walls, fires and heating we've fitted and finished in living rooms across Walsall
Prefer to Talk?
Message or call to book a free design visit. Send a photo of the room and the wall you have in mind, and we'll come back with a date.
Trusted by Walsall for Over a Decade
Don't just take our word for it. Read what Walsall customers say about the standard of our work.
“Very professional, cleaned up any mess. I would thoroughly recommend.”
Kenneth
October 20, 2025
Checkatrade
“Sharif replaced my faulty thermostats within hours of contacting them. They gave honest advice on products that suited my budget and fitted everything professionally. Would definitely use them again and recommend to others.”
Duane
September 30, 2025
Checkatrade
“Sharif is an outstanding technician with a diverse skill set. He provided exceptional service, replacing all the pipes for the leaking sinks in both our bathroom and kitchen. He also conducted comprehensive tests to ensure everything was functioning efficiently. We highly recommend Sharif and his company for their professional and high-quality work.”
Kain
September 24, 2025
Checkatrade
“Smart efficient solutions for all budgets. Very professional and friendly service.”
Akash S
November 15, 2025
Checkatrade
We Are a Local Small Business in Walsall
We're a local Gas Safe registered engineer and renovation team based in Walsall, working across every WS postcode plus Aldridge, Bloxwich, Brownhills, Darlaston, Willenhall, Pelsall, Wednesbury and Wolverhampton
Other Renovation and Heating Services
The parts of a living room we also do on their own

Media Wall Gas Fires
Just the fire and the flue in a media wall your joiner is building.
Learn More
Radiator Installation & Repairs Walsall
Designer and vertical radiators fitted, old ones replaced.
Learn More.png)
Underfloor Heating Walsall
Warm floors instead of radiators, fitted before the new flooring goes down.
Learn MoreLiving Room Renovation in Walsall: How It Works and What's Involved
The parts of a living room refit, what happens in what order, and what you don't need to pay for
The parts of a living room renovation, in plain English
- Media wall: a stud wall built out from the existing wall with a recess for the TV and an opening for the fire. Built from fire rated board around the fire, with the cables and gas hidden inside.
- Gas fire and flue: a balanced flue gas fire vents straight through the outside wall behind it, so it suits a media wall. The gas run and the flue hole go in before the wall is boarded.
- Electric fire: only where an old gas fire is being replaced. Wired to a fused spur hidden in the wall.
- Radiators: old panels replaced with vertical or designer radiators, moved to suit the new layout, or removed in favour of underfloor heating.
- Underfloor heating: warm water pipes under the floor, run from your boiler, fitted before the new flooring. The whole floor becomes the radiator and the walls stay clear.
- Electrics and lighting: sockets behind the TV, downlights or wall lights, dimmers, a dedicated supply for the fire and the TV. Signed off by an NICEIC registered installer.
- Plastering: the media wall skimmed, old fireplace openings closed, walls made flat.
- Decorating: mist coat, two top coats, woodwork glossed.
- Flooring: engineered wood, laminate or carpet, laid after everything else.
- Chimney: if the old fire goes and no new one goes in, the chimney is capped and vented so it stays dry.
What's involved, in order
- Days one and two: strip out, old fire and radiators off, chimney dealt with, first fix gas and electrics run to the new positions.
- Days three and four: media wall framed and boarded, underfloor heating pipework laid and pressure tested if it's going in.
- Days five and six: plastering, then the fire fitted, flued, connected and spillage tested.
- Days seven and eight: radiators fitted and balanced, second fix electrics, lighting and sockets.
- Days nine and ten: decorating, flooring, TV mounted, snagging and handover. A media wall on its own is three to four days; the full room is one to two weeks.
Honest advice: what's overkill
- A one metre wide fire: the fashionable extra wide fires push the TV up the wall so you watch it with your neck bent. A 750mm fire looks the same and keeps the TV at eye level.
- A fire on an internal wall: it can be done, but the flue has to be routed to an outside wall or a chimney and it costs more. Put the media wall on an outside wall if the room gives you the choice.
- Electric fire because gas seems hard: a balanced flue gas fire goes into a media wall on any outside wall. If you want a real flame, have one. We only fit electric where a gas fire is coming out.
- Underfloor heating in a room you're not reflooring: it's a great fit for a full refit with new flooring. If the floor is staying, vertical radiators do the job for far less.
- Worth paying for: the first fix visit before the joinery starts, and a proper heat loss check for the room. One means the fire and cables are exactly where you want them; the other means the new radiators or floor actually heat the room.
When to book a design visit
Before anything is built, and ideally before you've bought the fire or the TV. Send a photo of the room and the wall you have in mind and we'll book the free design visit. Book a free design visit
_(200_x_100_px)_(4).png)


